The borgata casino bonus codeBearspaw Water Treatment Plant (WTP) was constructed in 1972 and is one of the two plants that provides the residents of Calgary with clean drinking water.
The Stage 1 – Filter Pipe Gallery Upgrades project was constructed within the current borgata casino bonus codeBearspaw Water Treatment Facility and included major upgrades to the Stage 1 Filters borgata promo codeas well as replacement of both stage 1 & 2 Filter distributed control systems. As General Contractor, Graham was responsible for new piping, process valves/actuators, instrumentation, access grating/platforms, water quality monitoring stations, lighting, loading dock, and HVAC System.
Contract Value
$10M CAD
Prime Consultant
Associated Engineering
Project Owner
City of Calgary
Contract Format
Stipulated Price
Completion Date
Spring 2022
Contract Duration
22 Months