The City of Calgary<\/em> (Green Line LRT Program<\/em>) stated in their press release that \u201c\u2026Graham brings its extensive experience from major infrastructure projects across North America to the Green Line LRT Project.\u201d<\/p><\/blockquote>\nborgata promo code\u2019S SCOPE<\/strong><\/h2>\nAs General Contractor, borgata promo code<\/em> will construct a railway overpass or a grade separation structure at 78 Avenue S.E. allowing an extension of 78 Avenue S.E. underneath the CPKC mainline. This will enable vehicular traffic to access the industrial area east of the CPKC right-of-way. Following the opening of the 78 Avenue S.E. CPKC overpass to the public, the at-grade crossing at 69 Avenue S.E. will be closed permanently. The other component of this project is to construct a Pedestrian Tunnel from the future Ogden station to the east side of the CPKC right-of-way and Ogden Dale Rd S.E. With\u00a0approximately 26 trains\u00a0per day operating on CPKC\u2019s main line, this complex enabling works project will reduce project and schedule risk as Green Line prepares for main LRT construction.<\/p>\nAssociated work includes new storm sewer connections (catch basins and sewers) to the existing storm sewer system along Ogden Road S.E. and 78 Avenue S.E. In addition, a concrete storm duct is proposed on the east side of Ogden Dale Road S.E. to support the new road works. Additionally, updated street lighting and associated electrical infrastructure along 78 Avenue S.E. will be undertaken, as well as installation of new street lighting and electrical infrastructure along Ogden Dale Road S.E. Landscaping of disturbed areas including the planting of new trees and vegetation will also be completed.<\/p>\n
ABOUT THE GREEN LINE LRT<\/strong><\/h2>\nThe Green Line is The City of Calgary\u2019s next light rail transit (LRT) line and largest infrastructure investment in our city\u2019s history. With .5 billion in funding commitments from the Government of Canada, Government of Alberta and City of Calgary, the approved Stage 1 alignment is ready for construction beginning with the first phase from Shepard to Eau Claire.<\/p>\n","protected":false},"featured_media":253968,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[],"tags":[172,47,469,12,17,334,468,16,435],"class_list":["post-253967","news","type-news","status-publish","has-post-thumbnail","hentry","tag-ca-ab","tag-ca-ab-calgary","tag-city-of-calgary","tag-construction-news","tag-engineering","tag-borgata promo code-construction","tag-green-line","tag-infrastructure","tag-lrt"],"acf":[],"yoast_head":"\n
Green Line LRT Board selects borgata promo code to build the 78 Avenue Project - borgata promo code Construction & Engineering Inc<\/title>\n \n \n \n \n \n \n \n \n \n \n \n\t \n\t \n\t \n \n \n \n\t \n