Kitchener Wastewater borgata casino reviews Plant

Location: Kitchener, ON

The Kitchener Wastewater borgata casino reviews Plant (Kitchener WWTP) project was comprised of a new Headworks building and upgrades to the Secondary borgata casino reviews area of the existing facility. The scope of work required for this project included the installation of all associated electrical, HVAC, plumbing, effluent water, potable water, hot water, gas detection and SCADA (Supervisory Control and Data Acquisition) systems. Work also performed on the project included the demolition of the existing Headworks Building and Plant II pumping station and the associated equipment piping and services. There was extensive structural cast-in-place concrete work involved and over 30,000m3 of concrete was poured.

borgata casino reviews challenges included extensive dewatering, working within an operating facility, and maintaining the existing process during multiple shut-downs and isolations. The project is also staged due to the requirement of C4 (tertiary building under borgata casino reviews) to allow the demolition and reconstruction of RAS Station 2.

Contract Value

6M

Prime Consultant

AECOM

Project Owner

Regional Municipality of Waterloo

Contract Format

Stipulated Price

Completion Date

December 2018

Contract Duration

42 months